We will prepare a letter and make it available on the webpage for the teams to download and carry with them. On the basis of our discussion at the steering committee, this has not been …
Month: July 2019
Multiple boards
Is it allowed to swap boards during the testing in case something goes wrong with our transistors or do we have to manually solder new components? The package of our transistors is such that we …
Is soldering equipment going to be provided during all of the tests?
The teams will have access to the room available starting at 7am Monday to drop equipment before the welcome presentation. During the competition, there will be 4 “troubleshooting” stations with Oscilloscope, 30V Power supply, Signal …
Which of the tests will be performed while our device is in its mechanical enclosure?
All the tests will be performed in the mechanical enclosure designed by the team. They will not have to be opened and examined during any testing.
Final report
I’ want to confirm that there is no need to prepare final report. it’s not be mentioned at “Request for Proposals”. There will be no final report requirement. Specifications sheet and the elevator pitch take …