Good idea. We will try to arrange for something like that, using the commercial hardware.
Month: July 2019
Efficiency map
at TECHNICAL REFERENCE and PRELIMINARY TEST PROCEDURE(Updated 17 July 2019) ,their efficiency map has different condition which one is correct? The preliminary test procedure is a work-in progress document as we set-up the automated and …
Over-speed Fault Handling
Is the converter operation supposed to shut down the converter if over-speed is reached? I am asking because of the free acceleration test, “d. Free Acceleration This test will be evaluated pass/fail. Must complete accel …
I am a judge of the IFEC. Should I book my own hotel?
Please make your own reservations, and we will arrange for reimbursement after the event.
Meters per lap
We found the parking lot in Madison on google maps, and it seems there is about 220m per lap. The Techincal Reference says 400m per lap. Which information is correct? Is the total race length …
Disabled State
Is it required to provide a 5V output during “Disabled State” (Battery Current <1mA) ? No. 5V is used to power the Hall sensors routed through the connectors. As long as you have an internally …
Status Indicator Function (C.d.iv.)
According to the most recent change of rules related to LED signalization, it is required to detected that Hall Sensors are disconnected even when e-stop is on (Basic operation test C.d.iv. in Test Procedure Document). …
Preliminary Test Procedure Updated July 17
LED indicators are not required when the E-Stop is ON (open).
Preliminary Test Procedure Published
The preliminary final competition test procedure has been published. Preliminary Test Procedure
Rules Clarification July 17th
June 17th- Section 14 – Indicator lights are not required when the E-Stop is ON (open). June 12th – The following changes were made to the Technical reference guide. Section 9.a – Switched throttle connector …