Race order and final day procedures

Posted on July 30, 2019

Hi all, We will gather at 9:00 a.m., Wednesday, 31st July 2019 for the final race event of IFEC 2019. The racing order will be reverse rank order as of end of today. It would …

Posted in UncategorizedLeave a comment

Final Competition Scoreboard

Posted on July 29, 2019

https://docs.google.com/spreadsheets/d/1heE1HNLHU_eB8zFDjyE1h5zwqNtDEmKlO2cWo64VpJI/edit?usp=sharing

Posted in UncategorizedLeave a comment

Updated test procedures with schematic diagrams, 28th July 2019

Posted on July 28, 2019

This file has updated test procedures along with schematic diagrams. 2019 July 28, IFEC 2019 E-Bike Test Procedure

Posted in UncategorizedLeave a comment

When are we supposed to send Specification sheet and where?

Posted on July 27, 2019

Please send a pdf file of the Specifications Sheet of your team’s design entry to the following e-mail address as an attachment. Please use a naming convention: Teamname.pdf for the file. The deadline for submission is …

Posted in UncategorizedLeave a comment

Schedule details

Posted on July 26, 2019

This file has information about location, schedule, and other details: IFEC19 Schedule details

Posted in UncategorizedLeave a comment

E-Stop differences in specification. Can please describe the mechanism very detailed. Because we found differences in the technical references.

Posted on July 26, 2019

In the technical reference 0V are requeired to disbale the drive and 5V to enable. Will these signals be externally provided or do we have to create a constant 5V during the disbled mode. This …

Posted in UncategorizedLeave a comment

Final Competition Agenda

Posted on July 26, 2019

Please find the final competition agenda here: IFEC19 Final Competition Agenda

Posted in UncategorizedLeave a comment

Dynamometer test schematic diagram

Posted on July 25, 2019

Please find a copy of the wiring connections for the test schematic here for the dynamometer testing. Your EQUIPMENT UNDER TEST needs to have FOUR connection cables — one three phase connector to the motor …

Posted in UncategorizedLeave a comment

Since there are two penalty free attempts for the field test, will you consider the better time or the second attempt?

Posted on July 24, 2019

We would expect to use the best of the two attempts. The panel of judges be meeting on site and finalizing some of these fine details. They will be announced and clarified before the field-test.

Posted in UncategorizedLeave a comment

As a reminder: You intended to provide a letter to avoid possible difficulties when entering the USA with the test hardware. We are concerned that there may be problems with our luggage.

Posted on July 24, 2019

WE WILL ARRIVE BY PLANE AND WORRY ABOUT GETTING DIFFICULTIES TO TAKE THE INVERTER PROTOTYPE INTO THE PLANE. COULD YOU MAYBE UPLOAD A LETTER THAT CLARIFIES THIS? We have not had this as an issue …

Posted in UncategorizedLeave a comment
  • You're on page 1
  • 2
  • 3
  • 4
  • Next page

Site footer content

University logo that links to main university website

Contact Us

  • University of Wisconsin - Madison
    1415 Engineering Dr.
    Madison, WI 53706
  • Email: giri@engr.wisc.edu

Website feedback, questions or accessibility issues: kyle.hanson@wisc.edu.

Learn more about accessibility at UW–Madison.

This site was built using the UW Theme | Privacy Notice | © 2023 Board of Regents of the University of Wisconsin System.